Welcome to Shanghai ANDME official website!

ANDME service hotline:

0573-85012235

WeChat
Your location:index > cases > Water conservancy > Fuchun River Reservoir
all

 

Project Name: Fuchun River Reservoir Foundation Reinforcement
Engineering materials: steel sticky plastic
Engineering time: 2014

 

Fuchunjiang Reservoir is located in Tonglu, Zhejiang Province, located in the middle reaches of the Qiantang River Fuchunjiang Qililong Canyon exit, upstream from the Xin'anjiang Hydropower Plant about 60 km downstream from Hangzhou, about 110 km. Fuchunjiang Hydropower Station was founded in August 1958, December 25, 1968 the first unit of power generation, power station after expansion, the last unit in May 2006 put into operation, the current six units operating normally, the power station stable power generation More than 40 years.

 

 

ANEME uses its independent development of sticky steel glue and reinforcement structure of the series of glue, and the daily maintenance department of the reservoir mutual cooperation, a thorough examination of the reservoir interior disrepair of the basic building interface, repair and convergence, the new Andeleny reinforced structural adhesive Series with a durable, anti-oxidation, compression and other significant advantages. Particularly suitable for large-scale construction of reinforcement.